Dépêches

Project Flow 2011 Videos Demonstrate How the U.S. Navy, Spirit AeroSystems, Terumo Heart and Others Complete Projects Faster Despite Shrinking Budgets and Timelines

Dépèche transmise le 27 février 2012 par Business Wire

SAN JOSE, Calif.--(BUSINESS WIRE)--Realization, a premium provider of Real Time Synchronization solutions for project execution, today announced that video case studies from the world’s premier project execution conference, Project Flow 2011, are now available at http://www.realization.com/pf2011/PF2011_Conference_Videos_v3.html on Realization’s newly redesigned website. In these videos, executives from industry-leading organizations discuss the details of how they successfully synchronized project execution and, as a result, were able to complete projects 20 to 50 percent faster, generating additional cash and profits for their organizations’ bottom lines.

Organizations represented in the videos include aerospace MRO (maintenance, repair and overhaul) organizations such as the U.S. Navy’s Fleet Readiness Center, Cherry Point and Delta Air Lines; manufacturers such as Japan’s ASAHI Seisakusho and Brazil’s Embraco; aerospace manufacturers such as Boeing and Spirit AeroSystems; construction companies such as Japan’s Daiwa House; IT companies such as Verint; and medical device companies such as Terumo Heart.

Below are examples of success stories contained in the presentations:

  • Aviation MRO (Maintenance, Repair and Overhaul): Representatives of Delta Air Lines discuss how they increased the total number of aircraft maintenance checks with fewer personnel, significantly improved on-time delivery and dramatically reduced the number of maintenance-related flight cancellations.
  • Engineer-to-Order/Engineering: Executives at ASAHI Seisakusho, Japan, show how the company achieved profitability by rapidly speeding completion of projects while simultaneously reducing overtime after implementing Real-Time Synchronization.
  • IT: Japans largest homebuilder, Diawa House, discusses how it completed an SAP implementation project 25 percent faster by implementing Realization’s Real Time Synchronization solution.
  • Manufacturing: Embraco, Brazil, the largest refrigerator compressor manufacturer in the world, shows how it accelerated value creation to customers and shareholders by increasing throughput on research and development projects.

The Project Flow 2011 Conference video case studies provide real-world examples of how organizations in a wide range of industries were able to complete projects faster. Realization’s Real-Time Synchronization project execution methodology improves the rate of project execution, which leads to significant improvements in project completion times, throughput and cost performance. As a result, organizations add millions of dollars to their bottom lines and balance sheets via additional revenue, cost savings and monetized inventory. For more information, please visit www.realization.com.

About Realization

Realization helps organizations do projects 20 to 50 percent faster by replacing fixed schedules, which cannot be followed when ground conditions keep changing, with Real-Time Synchronization, a complete solution of software and services. Realization's more than 200 clients include organizations like ABB, Amdocs, BHP Billiton, Dr. Reddy's, L&T, Medtronic, NASA and the U.S. Air Force. Collectively Realization's clients have realized $3.5 billion in additional cash and profits by doing projects faster. Realization is headquartered in San Jose, California, with partners in India, France, Spain, Brazil, Japan, and South Africa. For more information, visit www.realization.com.

Business Wire

Les plus belles photos d'avions
Dassault Mirage F1CR (33-NE) Dassault Mirage F1C (30-SC) Dassault Mirage F1B (33-FY) Dassault Mirage F1B (33-FG) Dassault Mirage F1B (33-FG) Dassault Mirage F1B (33-FA)